All projects
No. 01Manufacturing Engineering InternshipSummer 2026

GE Vernova

A summer on a manufacturing floor: designing tooling the shop can reproduce without me, doubling a line’s throughput in a kaizen event, turning scattered maintenance data into one live view, and building an onboarding hub for the commercial team.

2xCPT throughput in a kaizen event
7Excel sources in one live dashboard
300+monthly work orders prioritized
3new hires onboarded with the hub
01

Tooling the floor can reproduce without me

  • Designed load-bearing lift bracket extensions in SolidWorks.
  • Validated a 200 to 300 lb load case with stress analysis.
  • Machined the parts in-house and made full drawings, so any work center can make more.
02

Doubling a line in one week

During a Shingijutsu kaizen event on the CPT line, we applied lean methods to process flow and waste, and doubled production throughput inside the week.

03

One live view of maintenance

  • Consolidated 7 continuously updating Excel sources into one live dashboard with Power Query.
  • Added AI-assisted ranking to prioritize preventive maintenance through IBM Maximo, across 300+ monthly work orders.
  • Built a Maximo PM library with frequency-based routines, new asset registrations, and formal parts quotes.
04

An onboarding hub the team uses

  • Interviewed the commercial team to define requirements, then iterated on drafts with their feedback.
  • Built an SSO-secured site that replaced scattered SharePoint docs with summaries and downloadable source PDFs.
  • Onboarded 3 new commercial hires with it, with rollout continuing.
  • Presented to CDP participants and commercial leadership on building HTML dashboards with Amp and publishing them to GitHub.
06Gallery

More photos.