A summer on a manufacturing floor: designing tooling the shop can reproduce without me, doubling a line’s throughput in a kaizen event, turning scattered maintenance data into one live view, and building an onboarding hub for the commercial team.
2xCPT throughput in a kaizen event
7Excel sources in one live dashboard
300+monthly work orders prioritized
3new hires onboarded with the hub
01
Tooling the floor can reproduce without me
Designed load-bearing lift bracket extensions in SolidWorks.
Validated a 200 to 300 lb load case with stress analysis.
Machined the parts in-house and made full drawings, so any work center can make more.
Finished lift bracketsBrackets and extension off the machinePaint pump mounting area
1 / 3
02
Doubling a line in one week
During a Shingijutsu kaizen event on the CPT line, we applied lean methods to process flow and waste, and doubled production throughput inside the week.
Intern Lean Day
03
One live view of maintenance
Consolidated 7 continuously updating Excel sources into one live dashboard with Power Query.
Added AI-assisted ranking to prioritize preventive maintenance through IBM Maximo, across 300+ monthly work orders.
Built a Maximo PM library with frequency-based routines, new asset registrations, and formal parts quotes.
04
An onboarding hub the team uses
Interviewed the commercial team to define requirements, then iterated on drafts with their feedback.
Built an SSO-secured site that replaced scattered SharePoint docs with summaries and downloadable source PDFs.
Onboarded 3 new commercial hires with it, with rollout continuing.
Presented to CDP participants and commercial leadership on building HTML dashboards with Amp and publishing them to GitHub.